24 February 2016

Royal IHC delivers 1,840m3 TSHD MAHURY

 

On 18 February 2016, Royal IHC delivered the trailing suction hopper dredger (TSHD) MAHURY to Baggerbedrijf de Boer – Dutch Dredging. The twin-screw TSHD was built at IHC's partner shipyard, MTG Dolphin, in Varna, Bulgaria.

PDF version of this press release

Photo





The MAHURY was successfully launched on 14 August and named on 29 October 2015 in Varna. It is the fourth TSHD of Baggerbedrijf de Boer – Dutch Dredging built by IHC, following the ALBATROS, AMAZONE and LESSE.

Interesting links

Royal IHC successfully launches TSHD MAHURY

Royal IHC names 1,840m3 TSHD MAHURY

Main features

Name

MAHURY

Length

75m

Breadth

13.4m

Depth

4.1m

Draught at dredging mark I, dredging within 15 miles from shore

3.48m

Draught at dredging mark II, dredging within 8 miles from shore

3.80m

Hopper capacity at highest overflow level

1,840m3

Inside diameter of trailing suction pipe

600mm

Dredging depth

30m

Total installed power

2,440kW

Trial speed

9.3knots

Accommodation

9 people